Leicester Data Room Air Conditioning Installation

Chillaire Limited carried out the installation of three Mitsubishi Electric wall split type air conditioning systems, from the Mitsubishi Electric PKA-P wall range to provide 14 kW of cooling capacity into a data centre room at our customer site in Leicester, Leicestershire with spare standby capacity.

Mitsubishi Electric PKA-P

The Mitsubishi Electric indoor wall units were installed with the Leicester data centre still fully operational. Care was taken while the work was carried with our engineers sectioning off the data room equipment with plastic sheeting to create mini work areas, the work was carried out in stages to ensure that sufficient cooling was still operation at all times to keep the Leicester data room at the correct required temperature level.

Back up support portable cooling units were hired in as back in case problems arose which could be set up rapidly to continue to provide sufficient cooling to the Leicester data room.

Our engineers worked long shifts to ensure the project was completed as per the agree programme with our client, in fact it was completed ahead of the agreed schedule.

We removed 2x existing Fujitsu wall air conditioning systems and installed the 3x new Mitsubishi Electric PKA-P wall fan coil units.

The Mitsubishi Electric Outdoor units were installed at low level on condensing blocks over a slab area installed into a grass verge on the side of the building occupied in Leicester by our customer.

We also installed a high temperature alarm with a light indicator and audible alarm to advise staff if the temperature in the data room starts to rise. The data centre is occupied 24 hours a day and out of hours security are alerted and can deal with any issues and now there is spare capacity.

We can supply and install auto diallers to call a number of phone numbers in and emergency or email staff out of hours, for anywhere the data centre or computer room is manned 24 hours a day.

For details of data centre or computer room air conditioning systems or any type of air conditioning systems you can call us on our Leicester local number: 0116 202 5094 or email us at sales@chillaire.co.uk

We cover the whole of the Leicestershire area, Leicester, Hinckley, Ibstock, Earl Shilton, Broughton Astley, Oadby, Blaby, Narborough, Loughborough, Shepshed, Coalville, Lutterworth, Magna Park, Market Harborough, Syston, Melton Mowbray and the rest of Leicestershire.

Call us today on Leicester: 0116 202 5094

Leicester Office: 3rd Floor, St George’s House, 6 St George’s Way, Leicester, LE1 1QZ

In addition to the Leicestershire county, we also cover the adjacent counties, Nottinghamshire, Warwickshire and Northamptonshire.

Local Warwickshire Office: Unit 1 Veasey Close, Attleborough Fields Industrial Estate, Nuneaton, Warwickshire, CV11 6RT

Nuneaton Office Telephone Number: 024 7632 0300 / Email: sales@chillaire.co.uk

Local Northamptonshire Office: Moulton Park Business Centre, Redhouse Road, Moulton Park, Northampton, Northamptonshire, NN3 6AQ

Northampton Office Telephone Number: 01604 269540 / Email: sales@chillaire.co.uk

You can call us on our Freephone number: 0800 092 9898

Visit our website for further details: www.chillaire.co.uk

New Refrigerants Being Introduced into the HVAC Industry

New R513A Refrigerant

Alternative to R134A and with the low GWP refrigerant R513A.

R513A refrigerant advantages:

1) Low GWP (Global Warming Potential): 631 instead of 1430 of R134A

2) Not flammable refrigerant (A1 Class)

3) Available for both Cooling Only and Heat Pump solutions

4) Performances similar to R134A

5) Also suitable for installation with low water temperature

 

R513A (Opteon© XP10) HFO/HFC blend type family 0% impact on the Ozone: ODP = 0
56% lower impact ON GLOBAL WARMING than R134a: GWP = 631 not flammable: A1 class
Also available for Retrofit of existing systems for both cooling only and Heat Pump versions.
Also available for Low Water Temperature applications.
Similar cooling performances to R134a refrigerant:
Ideal for liquid Chillers and residential A/C

 

 R1234ZE Refrigerant

The HFO-R1234ze refrigerant, featuring a GWP value lower than 1 (GWP = Global Warming Potential), by far the lowest level in the market (R134a refrigerant has a GWP value of 1430!).

Daikin Introduce new generation of inverter driven air and water-cooled screw chillers with R-1234ze(E) refrigerant. The Air-cooled chiller range (TZ series) will be available from 130 kW up to 830 kW cooling capacity. The Water-cooled chiller range (VZ series) will be available from 340 kW up to 1600 kW cooling capacity.

The selection of R-1234ze(E) refrigerant goes towards minimising the global warming impact of screw compressor chillers thanks to the low Global Warming Potential in combination with high energy efficiency.

R-1234ze(E) is a HFO refrigerant (Hydro Fluoro Olefins). Its Ozone Depletion Potential (ODP) allegedly is equal to zero (0) and the Global Warming Potential (GWP) is 7 (according to the EU F-gas Regulation based on IPCC Fourth Assessment Report). The GWP value is less than 1 according to the IPCC Fifth Assessment Report.

The new range of screw compressor chillers will be equipped with Daikin design inverter driven single screw compressor with Variable Volume Ratio (VVR) technology.

An inverter drive modulates chiller capacity at part load in the most efficient way, while VVR (Variable Volume Ratio) adjusts compressor operation at any temperature conditions. A sliding valve fine-tunes refrigerant discharge pressure to match the operating condensing pressure. In this way refrigerant is compressed to just the right pressure level thus minimizing the energy losses typical of standard compressors designed with fixed volume ratio. Inverter drive for capacity control and VVR for discharge pressure fine-tuning, are working synergistically in order to optimize unit efficiency at any operating condition. Thanks to this superior technology, current Daikin R-134a and new R-1234ze(E) series are already compliant with 2021 Eco-design efficiency requirements. The R-134a ranges will be maintained in Daikin product portfolio allowing for a smooth market transition. The introduction of the new R-1234ze (E) range will provide a long-term solution that supports the HFC phase down schedule of the F-gas Regulation.

DAIKIN APPLIED IS THE WORLD’S FIRST COMPANY TO INTRODUCE A NEW GENERATION OF AIR-COOLED SCROLL CHILLERS WITH R32 REFRIGERANT.

For further information contact Chillaire Limited an accredited D1 certified supplier / installer of Daikin air conditioning products at the followings address:

Chillaire Limited
16 Lythalls Lane
Holbrooks
Coventry
CV6 6FG

Tel: 024 7624 9440
Email: sales@chillaire.co.uk

Sanyo Air Conditioning Spares

Chillaire Limited continue to supply Sanyo spares and providing replacement parts / systems for Sanyo air conditioning systems with replacement Panasonic spares / systems.

Sanyo which had been going since 1958 was merged and bought out by Panasonic air conditioning systems. The product ranges of Sanyo and Panasonic were merged under the Panasonic logo and the Sanyo name ceased to be an active brand, at least in air conditioning.

Over time virtually all of the Sanyo RAC products and all of the Sanyo residential air to water range were replaced by Panasonics RAC and Aquarea ranges.

Sanyo air conditioning commercial products had already been launched into Panasonic range,starting with ECOi electric VRF which replaced the previous Urban Multi UM4 range in its entirety and running alongside Panasonics own FS-Multi simplified VRF range . A new Panasonic branded Elite PACi and GHP range followed, with Elite PACi being run in parallel with Panasonics own FS range.

Panasonic FS and FS-Multi ranges have been discontinued in the UK and the entire Panasonic commercial air conditioning and heating ranges are now based upon what was Sanyo’s PACi, ECOi and ECOG products.

Supporting the old Sanyo versions of these products is easy because the electronics are virtually identical.

Chillaire Limited have been supporting existing customers with Sanyo air conditioning systems already installed over the past 10 to 15 years. Chillaire Limited have, and continue to source and supply spares, technical support and replacement Panasonic equipment.

Chillaire Limited have when required attended customer sites with Panasonic (Sanyo) to assist with modification and repair of old Sanyo systems.

Chillaire with the support of Panasonic have access to Sanyo technical information. We recognise existing Sanyo model references. We can anyone who has Sanyo wall / cassette / ducted split systems, Sanyo multi split systems, Sanyo VRF systems or Sanyo chiller units

If you have Sanyo equipment on site and require any assistance, breakdowns, repairs or replacement please call Chillaire Limited on Coventry area 024 76320300, Northampton area 01604 269540, Leicester area 0116 2025094, Kettering & Peterborough area 01536 384046, Banbury area 01295 207682, Redditch area 01527 531275, Derby area 01332 561729 and Milton Keynes & Bedford area on 01908 483585. You can email us at sales@chillaire.co.uk or service@chillaire.co.uk for more information on air conditioning, heat pumps, gas fired heating, chiller units, VRV / VRF systems, ventilation, heat recovery, humidification and dehumidification systems visit our website www.chillaire.co.uk

Sanyo Air Conditioning Systems Spares & Technical Support

Panasonic & Sanyo Air Conditioning System Brands

Sanyo air conditioning were taken over by Panasonic air conditioning a few years ago, and have slowly phased out the Sanyo brand and are no longer supplying the Sanyo air conditioning branded range as Sanyo, but instead as Panasonic.

Any new spare parts for existing Sanyo systems come with the Panasonic logo / branding. Existing customer sites with existing Sanyo systems, where we have had to replace the whole indoor or outdoor unit due to faults, as they are sometimes compatible, can lead to having both Sanyo & Panasonic brand names on the same air conditioning split system, which can sometimes cause confusion. We usually install a label on the indoor or outdoor unit to clarify what has happened.

The good news for all customer with existing Sanyo equipment is that getting hold of Sanyo spare parts has not been an issue for Chillaire Limited. We can obtain spares through Panasonic or due to our knowledge of the air conditioning industry through our network of ex Sanyo suppliers. Chillaire Limited has a good relationship with the Panasonic technical department, who have ex-Sanyo staff with good Sanyo equipment knowledge to assist our engineers, even though our engineers have good knowledge on the Sanyo brand.

Chillaire Limited will continue to offer technical support and repair of Sanyo systems, for the foreseeable future. Our engineers have years of experience working on Sanyo split air conditioning and VRF systems. We will also continue to offer support for the Sanyo rooftop units, packaged units, chillers, close control air conditioning systems and their gas fired air conditioning systems.

Panasonic can offer a like for like replacement air conditioning systems for existing Sanyo air conditioning systems that may require upgrading or replacing, which they are able to do with relative ease and quickly. You also have the option to consider alternative brands, which Chillaire Limited can offer, such as  Hitachi / Daikin / Fujitsu / Mitsubishi / Samsung / LG matching existing Sanyo air conditioning system capacities, types of equipment and design.

If you have a Sanyo system that you are having problems with and you require assistance, feel free to contact us on 024 7632 0300024 7632 0300 or by email: service@chillaire.co.uk.

National regional numbers are available on our website: www.chillaire.co.uk

You can also call us on our National Freephone Number: 0800 092 98980800 092 9898 FREE

Sanyo Heat Pump Air Conditioning Systems


Having Problems with your Sanyo air conditioning systems, then it is time to call Chillaire Limited.

In recent years Chillaire have carried out extensive work on Sanyo VRF 3 pipe heat pump systems. One of the most common problems that we have had to attend to on a number of occasions has been to faulty reversing valves, which appear to get stuck mid way and the system is unable to provide 100% heating or cooling.

We are able to continue to source replacement spare parts from Panasonic who took over Sanyo, including these reversing valves.

The work involved in replacing these valves is difficult and costly to the end user.

Another problem reported by the Chillaire engineers is problems with the mother board which on occasions requires an update to its software which has to be carried out by the manufacturers Sanyo (Panasonic) which has been arranged by Chillaire Limited.

We have been doing repairs in the Midlands and Warwickshire area, but will offer our services throughout England and Wales.

Problems with reversing  valves, mother boards and any other problems associated with Sanyo VRF systems or split systems can be resolved by Chillaire engineers.

Panasonic air conditioning systems are able to offer direct replacement new systems from their VRF and split Panasonic range.

We can assess your current Sanyo air conditioning system, whether it is a VRF or split range and match up a system from the Panasonic range. We will remove the old Sanyo system and install the new Panasonic system. We may be able to retain the existing interconnecting services or install new interconnecting services depending on the condition of the existing services.

For further information call us on our main call centre 024 7632 030 or go to our website for your regional phone number. You can email us at sales@chillaire.co.uk

Carrier “AquaSnap” Heat Pumps & “Greenspeed” Intelligence

Carrier Air Conditioning has introduced the new generation of AquaSnap® air-to-water scroll heat pumps with Greenspeed® intelligence, offering new levels of efficiency and performance for building owners. Carrier a world leader in high-technology heating, ventilation, air-conditioning and refrigeration (HVACR) solutions is a part of UTC Building & Industrial Systems.

The new generation of 30RQP AquaSnap heat pumps combines both simplicity and intelligence. The product features the latest technologies including variable-speed driven fans, brazed plate heat exchangers with asymmetric channels, electronic expansion valves and a coloured touch screen user display.

This new range includes an innovative defrosting method, which may be used without consuming any additional energy. Therefore, it can significantly improve the seasonal coefficient of performance (SCOP) of the heat pump by up to 12 percent compared with earlier AquaSnap models. This defrosting method generates shorter payback, higher efficiency and reliability and improved comfort, reducing noise and vibration emission level as well as environmental impact.

The built-in hydraulic modules with optional variable-speed driven pumps can electronically control the variable water flow to meet real application needs during partial load operation and stand-by periods, thus significantly reducing the pumping energy consumption by two-thirds. The modules also feature electronic sensors for automatic pump protection against cavitation and for water flow electronic reading and setting.

The energy efficiency performance of the AquaSnap heat pumps with Greenspeed intelligence already meets the 2017 European Ecodesign regulation with a SCOP value in heating of up to 3.38. The new range also offers segment leading performance with European Seasonal Energy Efficiency Ratio (ESEER) values in cooling of up to 4.28.

In addition, the new AquaSnap range utilises proven technology that Carrier and service engineers are familiar with and trained on to carry out routine service & maintenance.

“Carrier provides a unique value proposition for customers, with unprecedented levels of performance and efficiency in its AquaSnap line of heat pumps.

Chillaire Group offer the Carrier range of chillers & heat pumps to existing customers and new customers. for further detail you can contact us at our head office on 024 7632 0300 or you can email us at sales@chillaire.co.uk

F-Gas Records – Not Keeping up to date F-Gas records could put users and owners of refrigeration and air conditioning at “risk of legal action”

If users or owners of refrigeration and air conditioning equipment do not keep documentation on site is up to required standards of new F-Gas legislation, could leave them to them open to the risk of legal action being taken by the ruling body of F-Gas compliance.

F-Gas compliance standards on many commercial refrigeration and air conditioning sites fall short of mandatory requirements.

Chillaire Limited believes that contractors need to investigate and review their current approaches to ensure that F-Gas requirements are met properly, and customers (Users or owners) are better informed about their responsibilities, we regularly send out reminder letters to all of our customers. A key element for both the contractor and the customer is the need to maintain detailed records on site for activities involving work on all refrigeration / air conditioning or any F-Gas-containing equipment.

The F-Gas Regulation lays down strict requirements for record keeping, designed to ensure a log is available on site for all operations affecting F-Gas plant.

This has to include a log sheet for every applicable F-Gas asset, and record all mandatory leak tests carried out, whether any leaks are identified and if any remedial work is required, with a record of all refrigerant moved in/out of the plant.

Importantly, there is a requirement to log all top-ups of F-Gas refrigerant made to equipment. Full records should be kept for at least five years. This is designed to ensure there is a continuous log of F-Gas-related work, giving inspecting authorities a complete history to ensure cradle-to-grave compliance. However from experience this not always the case.

The requirement applies to all systems containing more than 5 tonnes CO2-equivalent of F-Gas, and includes the common refrigerants R134a, R410A, R407C and R404A. Hermetically sealed equipment containing up to 10 tonnes CO2-equivalent is exempt, and there is a grace period for units containing less than 3 kg of any F-Gas to the end of 2016.

The obligation came into force on 16 April 2014, with the introduction of EC Regulation 517/2014, updating the previous 2007 Regulation.

Our engineers have attended new sites, where Chillaire Limited has recently taken over the service & maintenance contract and there is no F-Gas Register with the necessary information for each piece of relevant equipment. In these situations, end users are laying themselves open to legal action.

In some cases, there is some form of register or fragmented service record, but the information is incomplete or out-of-date and very difficult to review, meaning equipment owners are not compliant. It is a major issue.

This is usually a major problem on sites attended by different contractors over a period of time, with varying approaches and levels of compliance.

For example, a contractor responsible for a site may be replaced, perhaps a number of times over several years, and data lost or subsequently recorded in a different format or physical place.

An FM provider may be using various different contractors on the same site, who each have their own way of recording the F-Gas information, in some instances the contractor may not even bother, as they may only be going to that site the once on behalf of the FM provider.

The governing body assumes continuity, handovers of record keeping between companies and a minimum continuous record of five years, but in reality it may be different.

In this situation, the client whose responsibility it is to meet many of the F-Gas requirements is left exposed, if an inspection reveals incomplete or non-existent records. Many equipment owners assume that because they have a maintenance contract in place with an F-Gas registered service company, they are fully covered in terms of F-Gas compliance.

The regulation clearly lays down specific responsibilities on equipment owners, for record keeping as well as physical leak checks, and they are legally responsible for meeting them.

Responsibility is only passed to the service company if this is agreed as part of the contract. Unless this transfer of responsibilities is explicitly agreed, the default position is the equipment owner is responsible in law.”

Enforcement agencies are known to be stepping up action around non-compliance, with some cases going to court.

Chillaire Limited keep customer F-Gas equipment asset registers and logs all service maintenance visits and keep copies of all F-Gas visit check sheets for each visit and each end user / customer on file. We can provide copies to end users or customer upon request.

Chillaire HVAC & Refrigerant Retrofit or New Modern HVAC System Option?

HVAC systems (Refrigeration / Air Conditioning / Heat Pump) replacement is a costly and messy process that can disrupt building operations over an extended period of time. This means it’s crucial to ensure the retrofit produces the maximum benefit. Not only will this enhance the operation of the facility, it will also help to ensure that the retrofit process will not have to be repeated in the near future.

Customers / Users embarking on an HVAC retrofit should keep the following in mind.

Like for Like Plant Swap?

The easiest and quickest way to replace an older HVAC system is to put in a new system that matches the old one. For example, when the building chiller unit or rooftop package air conditioning system reaches the end of its service life, it is common practice to install a new chiller unit or rooftop package unit of the same type and capacity. Conditions today are probably different, perhaps vastly different, than they were when the original chiller was installed. These days there are alternative options such as VRV or VRF heat recovery heat pump multi systems as well.

While that approach is simple and quick, it is often not the best choice. Most HVAC systems and their components have normal service lives of 15 to 25 years if properly maintained. When a system is originally installed, it is sized and designed to meet the needs of the building at that time. Buildings change, and so do the operations that take place within the buildings. There might be more people in the building and more electronic equipment – computers, printers, copiers and the like. Simply replacing ‘like for like’ does not take these changes into consideration. To get the most out of HVAC system retrofits, the new system with new options must be designed to match the current and future needs of the facility.

New Modern Technologies

HVAC technology has achieved tremendous progress in the past 15 years. New DDC control systems provide a better climate while reducing energy costs. High-efficiency or alternative-fuel chillers can reduce the cost of air conditioning. Variable frequency drives can improve the operating efficiency of both chillers and fan systems. Interoperable building automation systems give facility executives the tools they need to better manage operations.

Although these HVAC technologies are relatively new, they are not risky. They have proven themselves in a range of applications. They are widely used today in new construction. Many are considered essential to keep facilities competitive.

An HVAC retrofit is often a good time to take advantage of these newer HVAC technologies. To determine which technologies are appropriate and cost-effective for the application, take a close look at the existing facility and how it is operated.

System Flexibility Options

Buildings today are in a constant state of churn. Interiors are rearranged. Old tenants move out and new ones move in. Infrastructure requirements increase. The result is that customers are constantly changing facilities to meet the needs of occupants or their own internal operations. One thing that doesn’t change easily in many existing buildings is the HVAC system.

This is why flexibility should be a key goal of HVAC system retrofits. HVAC systems should be able to adapt to those changes without requiring costly alterations. Otherwise, customers face a no-win situation: covering the cost of expensive changes to the HVAC system or living with an HVAC system that can’t keep up with changes in the building. Technology also moves on and there are better alternatives to consider.

Partial-load Performance

Chillers are the single largest users of electricity in practically all buildings. Not surprisingly, improving the efficiency of chillers has been a major goal for chiller manufacturers. As a result, today’s chillers are 25 to 50 percent more efficient at full load than those of 15 years ago. When selecting replacement chillers, much emphasis is paid to this full-load efficiency rating, however that’s only part of the picture.

Most chillers operate at full load for less than 10% their total run time. The other 90% of the time chillers are operating below full-load capabilities. As the load on chillers decreases, so does the efficiency of the units.

Because chillers operate under part-load conditions for such a high percentage of their run times, the annual energy cost of the chiller will be determined primarily by its part-load efficiency. Although it might cost more to purchase a unit with better part-load efficiency, this premium will be recovered many times over through energy savings during the life of the chiller.

Service & Maintenance

As HVAC systems age, maintenance requirements increase. Maintenance costs are too often ignored when system retrofits are being evaluated. In fact, as long as a system doesn’t stop working, it might not even be considered as a retrofit candidate. Just because a system is able to limp along doesn’t mean it’s operating efficiently or meeting the requirements of the application.

Look through maintenance records for the building. High maintenance costs and increasing maintenance requirements are an indication that those systems or components might be approaching the end of their service lives.

Customers should set priorities for HVAC retrofits based in part on maintenance requirements.

Another factor to consider is the availability of replacement components. When components for a particular system are no longer available from the manufacturer, or if the manufacturer should go out of business, it is only a matter of time before it will be necessary to replace that system. This has happened frequently with building automation systems. Before the development of interoperable systems, users were at the mercy of the system manufacturer. Many manufacturers failed or decided to get out of the building automation system business. Others upgraded their systems and discontinued support for older generation systems. Once the spare parts inventory was depleted, users had little choice but to retrofit their building automation systems.

Consider also the maintenance requirements of the systems and components that are being installed as part of the retrofit. Can they be maintained by in-house personnel, or will their maintenance have to be performed under contract? What tools and training will be required to properly operate and maintain the new system? What are the projected maintenance costs? Ignoring maintenance requirements for the retrofitted system will only guarantee having to retrofit the system before it would otherwise be necessary.

Looking into the Future

There is a tendency when planning for HVAC retrofits to focus on only a specific component or portion of the HVAC system. Chillers that are becoming unreliable or the air handler that no longer meets the needs of the conditioned space, might be serious problems that demand to be addressed. But before making retrofit decisions, customers should step back and determine if other projects planned for the building will affect HVAC system operation.

For example, upgrading the lighting system or installing more energy-efficient windows will reduce cooling loads. If those projects are planned in the near future, then a planned retrofit program for the building’s chiller should be scheduled after they have been completed. Reduced cooling loads will allow a smaller chiller, reducing both first and operating costs.

Building Occupancy

One of the goals of any HVAC retrofit program is to improve the level of service. While customers might understand the technical problems with the existing HVAC systems, they will not fully comprehend the needs of building occupants unless they get them involved in the retrofit process. After all, occupants are the ones that understand their environments the best. Customers will not know what system will best meet occupant needs – indeed, they might not even have a good understanding of what their HVAC needs are. Occupant input will give the customer a clearer understanding of what the HVAC system will be expected to achieve.

Building occupants are also good sources of information on the performance of existing systems. Frequently, they are aware of problems that go unreported to building staff. That information is often crucial in setting priorities for HVAC system retrofits.

There’s one other good reason to get occupants involved: HVAC system retrofits can be disruptive. They can require temporary relocation of building occupants. Heating or air conditioning service may be disrupted for days or weeks. A schedule of moves and outages will have to be developed. Without the cooperation of occupants, retrofits can turn into scheduling nightmares.

Funding Approval

HVAC retrofits must compete with other departments for funding. Too often, though, the team responsible simply submit funding requests with little or no supporting information. As a result, projects fail to win the funding needed to perform a complete retrofit. Instead, components are patched together just to keep the system running.

To increase the chances of receiving funding, customers must submit their budget requests in a format familiar to financial managers. Energy savings, maintenance savings, return on investment: These are among the terms that will help convince financial managers of the value of the project.

It’s also important to provide the right level of detail. For example, if reliability is an issue, it isn’t enough simply to report that fact; instead, the team responsible must show that it is a problem with key supporting information. How many times has service been interrupted? What was the cost of those interruptions to the maintenance department? What was the cost to building occupants? What level of performance can be expected from the retrofit system?

An HVAC retrofit is a major undertaking for any customer, building occupants or the organisation’s management. It is also an opportunity, because of the cost and disruption involved, the same opportunity might not come along again for decades.

9. Refrigerant Gases

As of January 1st 2015, R22 Refrigerant will be discontinued. Systems using R22 that require invasive servicing or repair must undergo complete refrigerant R22 removal and deep system cleansing before introducing the alternative refrigerant. An increasing number of equipment manufacturers will be offering flammable refrigerants. Are you ready?

How much money does a saving of 30% energy consumption represent to you?

Sanyo Air Conditioning Systems Spares & Technical Support

Panasonic & Sanyo Air Conditioning System Brands

Sanyo air conditioning were taken over by Panasonic air conditioning a few years ago, and have slowly phased out the Sanyo brand and are no longer supplying the Sanyo air conditioning branded range as Sanyo, but instead as Panasonic.

Any new spare parts for existing Sanyo systems come with the Panasonic logo / branding. Existing customer sites with existing Sanyo systems, where we have had to replace the whole indoor or outdoor unit due to faults, as they are sometimes compatible, can lead to having both Sanyo & Panasonic brand names on the same air conditioning split system, which can sometimes cause confusion. We usually install a label on the indoor or outdoor unit to clarify what has happened.

The good news for all customer with existing Sanyo equipment is that getting hold of Sanyo spare parts has not been an issue for Chillaire Limited. We can obtain spares through Panasonic or due to our knowledge of the air conditioning industry through our network of ex Sanyo suppliers. Chillaire Limited has a good relationship with the Panasonic technical department, who have ex-Sanyo staff with good Sanyo equipment knowledge to assist our engineers, even though our engineers have good knowledge on the Sanyo brand.

Chillaire Limited will continue to offer technical support and repair of Sanyo systems, for the foreseeable future. Our engineers have years of experience working on Sanyo split air conditioning and VRF systems. We will also continue to offer support for the Sanyo rooftop units, packaged units, chillers, close control air conditioning systems and their gas fired air conditioning systems.

Panasonic can offer a like for like replacement air conditioning systems for existing Sanyo air conditioning systems that may require upgrading or replacing, which they are able to do with relative ease and quickly. You also have the option to consider alternative brands, which Chillaire Limited can offer, such as  Hitachi / Daikin / Fujitsu / Mitsubishi / Samsung / LG matching existing Sanyo air conditioning system capacities, types of equipment and design.

If you have a Sanyo system that you are having problems with and you require assistance, feel free to contact us on 024 7632 0300024 7632 0300 or by email: service@chillaire.co.uk.

National regional numbers are available on our website: www.chillaire.co.uk

You can also call us on our National Freephone Number: 0800 092 98980800 092 9898 FREE

F – Gas in Air Conditioning

Record keeping and maintenance requirements for companies that operate or service equipment containing fluorinated greenhouse gas (F gas).

Many refrigeration, air conditioning & heatpump systems contain Hydrofluoracarbons (HFCs). HFCs are a type of fluorinated greenhouse gas(F gas).

Companies that operate or service and maintain equipment containing F Gas must meet these requirements.

Check if your system contains F gas

Look at the list of F gases regulated by the EU.

To find out if your equipment contains one of these F gases you can:

  • check your manual or the labels on your equipment
  • speak to the company that installed your equipment

HFC 404A and HFC 134a are common in refrigeration systems.

HFC 23 and HFC 227ea are common in fire protection systems.

HFC 404A and HFC 410A are common in air conditioning and heat pump systems.

Use trained technicians

Only trained technicians can carry out work on equipment containing F gases, including:

  • installation
  • testing for leaks
  • general maintenance
  • disposal or decommissioning when you no longer need the product

For refrigeration systems in vehicles, (eg cars, trains and ships) this only applies to:

  • refrigerated trucks that weigh more than 3.5 tonnes
  • refrigerated trailers that are designed to be towed by a truck or tractor

Check that anyone working on your equipment is qualified.

Read more about the specific qualifications needed to work on equipment containing F gases.

Label equipment

You must add a label if you add F gas to refrigeration, fire protection or air conditioning equipment when you’re installing it. The label must state:

  • that the equipment contains an F gas
  • the industry name for the F gas, or the chemical name if there isn’t an accepted industry name

From 2017 the label must also state the:

  • mass of F gas in the equipment (in kg)
  • carbon dioxide (CO2) equivalent mass of F gas in the equipment (in tonnes)
  • the global warming potential of the F gas

Find the global warming potential of each F gas on the list of F gases regulated by the EU.

Find out how to use an F gas’ global warming potential to calculate the weight of the F gas in CO2 equivalent.

‘Hermetically sealed’ equipment

If F gas is ‘hermetically sealed’ within a product, the label must also state that’s the case. F gas is hermetically sealed if both of the following apply:

  • any part of the product that contains F gas is welded or brazed shut, or permanently sealed in another way
  • the product has a tested leakage rate of less than 3 grams per year

A system that meets these 2 conditions is considered hermetically sealed, even if it has capped valves or capped service ports to allow access for repairs and maintenance.

Check for leaks

You’re responsible for stopping leaks from your equipment.

Contractors that install, maintain or dispose of equipment share responsibility for trying to stop leaks with the operators of equipment.

You must check all equipment for leaks.

For equipment that contains F gas above certain thresholds, you must check for leaks at specific intervals.

Thresholds at which leaks check intervals are specified

The thresholds at which leak check intervals are specified are expressed in terms of CO2 equivalent.

They take into account both the quantity of F gas in the equipment and the ‘global warming potential’ of the F gas (how much the F gas contributes to global warming).

This table sets out the:

  • F gas thresholds, in tonnes CO2 equivalent, at which leak leak check intervals are specified
  • maximum allowed interval between leaks checks for equipment that meets each threshold
  • quantities of commonly used HFCs equal to each threshold
Maximum interval between leak checks CO2 (tonnes) HFC

23 (kg)

HFC

227ea (kg)

HFC

404A (kg)

HFC

410a (kg)

HFC

134a (kg)

1 year 5 0.3 1.6 1.3 2.4 3.5
6 months 50 3.4 15.5 13 24 35
3 months 500 34 155 127 240 350

You can find out global warming potentials of other F gases in the list of F gases regulated by the EU, and use global warming potentials to calculate the CO2 equivalent of an F gas.

Equipment that didn’t require leak checks under the 2006 regulation may do so now, if it contains an F gas with a high global warming potential, like HFC 404A.

Special cases and exemptions

If you install a system to automatically detect leaks, the maximum interval between leak checks is doubled. For example you only need to leak check a product that contains F gas equivalent to 5 tonnes CO2 once every 2 years, if you fit a leak detection system.

There’s no maximum interval for leak checks on hermetically sealed refrigeration and air conditioning systems unless they contain F gas equivalent to 10 tonnes CO2. That’s equal to 2.6 kg of HFC404A or 7 kg of HFC 134a.

The maximum intervals don’t apply until 2017 for equipment that contains less than 3 kg of F gas.

If you find a leak

If a leak is found during a check, you must repair it and repeat the test within a month to check the repair worked.

Install leak detection equipment

You must fit a leak detection system if your equipment contains F gas equivalent to more than 500 tonnes of CO2.

For gases commonly used in refrigeration, air conditioning or fire protection, this table sets out the mass of gas equivalent to 500 tonnes of CO2.

F gas Mass of gas equal to 500 tonnes of CO2
HFC 23 34
HFC 508 38
HFC 507 125
HFC 404A 127
HFC 434A 154
HFC 422D 183
HFC 438A 221
HFC 410A 239
HFC 407C 282
HFC 134a 350

The leak detection system must alert you, or a service company responsible for your equipment, if a leak is detected.

You must test the leak detection system checked annually to make sure it’s working properly.

A system that didn’t need leak detection equipment under the 2006 regulation may do so now, if it contains an F gas with a high global warming potential, like HFC 404A

F gases that can’t be used to refill equipment from 2020

From 2020 you won’t be able to use some ‘virgin’ (unused) F gases to refill existing refrigeration systems.

The ‘service ban’ will apply when both these conditions are met:

  • the refrigeration system contains F gas equivalent to 40 tonnes of CO2 or more
  • the virgin F gas has a global warming potential of more than 2,500

The service ban won’t apply to fire protection systems or air conditioning and heat pump systems.

Options when the ban applies

If you need to add refrigerant to systems affected by the ban after 2020 you’ll need to do one of the following:

  • use an F gas with a global warming potential of more than 2,500 that has been reclaimed (up to 2030 only)
  • use an F gas with a global warming potential of more than 2,500 that has been recycled either from your own equipment, or by the company servicing your equipment
  • remove all of the F gas from the system and replace it with an F gas that has a global warming potential lower than 2,500, eg HFC 407A of HFC 407F (this is known as ‘retrofilling’)
  • replace the refrigeration system with new equipment that uses a refrigerant with a lower global warming potential

Less of your equipment will be affected by the ban if you buy equipment that uses refrigerants with low global warming potentials.

Keep records

The operator of equipment, and the company that services it, must keep the following records about any equipment that has to be checked for leaks (ie any equipment that contains F gas equivalent to more than 5 tonnes of CO2):

  • quantity and type of gas in the equipment when it’s installed
  • quantity and type of gas added during any maintenance (eg leak repairs)
  • details (name, address and certificate number if relevant) of any companies that install, service or decommission the equipment
  • dates and results of all mandatory leak checks
  • measures taken to recover and dispose of gases when you dispose of the equipment (eg disposing of it through a registered waste carrier)

You must also record if the gas used in the equipment has been recycled or reclaimed and if so the:

  • details of the recycling or reclamation facility (name, address and certificate number if it has one)
  • quantity of any gases recovered

You must keep records for 5 years & make them available to any authority if requested.

The following requirements weren’t in the previous regulation:

  • recording measures taken to recover and dispose of gases
  • recording if the gas is recycled or reclaimed & the facility that recycled or reclaimed it

Recover F gases when disposing of equipment

You must use a qualified technician to recover F gas when disposing of equipment. Find out how to recover F gas.

Ban on new equipment

The EU is banning the use of some F gases in refrigeration, fire protection, and air conditioning and heat pump systems.

Find out more about bans on equipment containing F gases.

HFC phase down

The EU is cutting the availability of HFCs by 79% between 2015 and 2030.

Only companies with EU quotas will be able to supply HFCs to the EU market.

Equipment containing HFCs, particularly those with high global warming potentials, is likely to become more expensive to buy and maintain.

The HFCs that are part of the phase down are listed with their global warming potentials in section 1 of the list of F gases regulated by the EU.

The GEA Denco GAC and GAH range are now available with inverter compressors.

It is precisely in partial-load ranges of operation that the new GEA chillers / heat pumps with DC inverter scroll compressors are extremely energy efficient. They achieve an ESEER value of 4.8.

On the occasion of ISH 2013 (in Frankfurt am Main, Germany, from March 12 to 16, 2013, in Hall 11.0, Stand B91), GEA will present further-developed systems in the GEA GAC and GAH range. These air-cooled GAC chillers and GAH heat pumps are now equipped with inverter compressors. As improvement over their predecessor ranges, these new developments – thanks to their one or two integrated DC inverter scroll compressors – are highly energy-efficient, especially in their relevant partial-load operational ranges. In their rating classes, they achieve exceptional ESEER values, up to 4.8, and thereby reduce operational costs, amortization times, and CO2 emissions. Additional benefits of this new inverter compressor technology include more exact temperature control, continuously variable regulation of compressor speed, and – as a result – longer service life. By virtue of the inverters, the soft-start function is already integrated and does not require selection as an option. Thanks to their inverters, both system variants – the GAC chillers and the GAH heat pumps – require no or only small buffer tanks. In heat pump operations, air-intake temperatures down to -15 °C are possible.

Since the hydraulic connection of these new inverter-controlled systems is the same as that in the predecessor range, design of the water cycle can take place as usual. These new compact units are available as chillers and heat pumps, each in seven capacity ratings from 16 to 75 kW of cooling/heating duty, with or without an integrated pump. In their standard models, they can be installed either outdoors or indoors via duct connection.

Chillaire
Air Conditioning - Heating - Ventilation